IBIS Macromodel Task Group Meeting date: 10 Apr 2007 Members (asterisk for those attending): * Ambrish Varma, Cadence Design Systems * Arpad Muranyi, Intel Corp. Barry Katz, SiSoft * Bob Ross, Teraspeed Consulting Group * Doug White, Cisco Systems * Ganesh Narayanaswamy, ST Micro * Hemant Shah, Cadence Design Systems Ian Dodd, Mentor Graphics Joe Abler, IBM * John Angulo, Mentor Graphics John Shields, Mentor Graphics Ken Willis, Cadence Design Systems * Kumar, Cadence Design Systems Lance Wang, Cadence Design Systems Luis Boluna, Cisco * Michael Mirmak, Intel Corp. * Mike LaBonte, Cisco Systems * Mike Steinberger, SiSoft Patrick O'Halloran, Tiburon Design Automation Paul Fernando, NCSU * Radek Biernacki, Agilent (EESof) * Randy Wolff, Micron Technology Richard Ward, Texas Instruments Sanjeev Gupta, Agilent Shangli Wu, Cadence Stephen Scearce, Cisco Systems Syed Huq, Cisco Systems * Todd Westerhoff, SiSoft Vikas Gupta, Xilinx * Vuk Borich, Agilent * Walter Katz, SiSoft -------------------------- Call for patent disclosure: No one declared a patent. ----- Opens: ------------- Review of ARs: - Arpad: Review the new macro library files. TBD - Arpad: Write parameter passing syntax proposal for a possible BIRD TBD ------------- New Discussion: Presentation by three EDA vendors: - Presented by Todd - Gives a fairly complete description of the developed approach. - Slide 11: - Arpad asked about "non LTI" assumptions, which seemed backward. - Vuk: by assuming non LTI, no special simulator is required - Slide 13: - Ignore_Bits tells simulator that some number of initial bits may be garbage. - Ignore_Bits is a standard parameter - Other parameters may be optional - Arpad asked what use non-standard parameters have: - Simulator will not know what to do with them. - Walter: Strength can be set by user, the model knows what to do. - Slide 15: - Arpad: How many non-linear waveforms are needed when Init() used? - Kumar: maybe millions of bits; as many as it takes - Walter: - Without crosstalk 1 million bits need to be simulated - With crosstalk 10 million bits are needed - This is not verified. - Todd: some semi vendors feel the need to simulate time varying behavior - TX GetWave() should have PWL stimulus - Some color change suggestions for clarity. AR: Todd will fix a few typos in the presentation We will talk about drafting a BIRD in the next meeting, in 2 weeks. Next meeting: 24 Apr 2007 12:00pm PT